Project Name: Mayfair

Location: Mayfair, London

Date Completed: February 2017

Company Name: Aqua Platinum Projects

Architect: Squire and Partners

Working with prestigious developers Mclaren Construction and renowned architects Squire and Partners, Aqua Platinum Projects have designed a luxury wellness scheme inclusive of a swimming pool, steam room and sauna, within a new development in the heart of England’s capital. Aqua Platinum were appointed to design and build a bespoke freeboard swimming pool including a vitality area as part of the luxury basement development in Central London.

The pool has been expertly designed, with metallic effect mosaics, used to reflect the light and space within the pool hall, and that the finishes mirror the high quality, luxurious feel of the pool surround. The traditional sauna and steam room have both been finished to an exceptional standard, with the steam room tiled in a mosaic design to complement the swimming pool design. The pool has been expertly designed, with metallic effect mosaics, used to reflect the light and space within the pool hall, and that the finishes mirror the high quality, luxurious feel of the pool surround. The traditional sauna and steam room have both been finished to an exceptional standard, with the steam room tiled in a mosaic design to complement the swimming pool design.

This design encompasses many different design elements with a key focus on the colours used throughout. Although the pool hall walls include dark textured features and two darker columns, the use of the metallic tiles within the pool and the surrounding lights, have ensured that the overall feel is very open, light and natural. The swimming pool layout complements the pool hall perfectly allowing the pool to be as large as possible, however, not taking over the pool hall completely. It has been designed so users are close to the pool whilst still having space to relax in the other wellness areas.